![]() |
|||||||
Projects Overview
QA/QC Procedures
|
Summary |
Drill Results |
Maps and Sections |
Photo Gallery |
43-101 Technical Reports
Mineral Resources
January 13, 2010 Summary Orko Silver and Pan American Silver continue to advance the La Preciosa project.
La Preciosa property is located in Durango State, 47 km northeast of the city of Durango. It consists of a block of mineral exploitation concessions covering 32,400 hectares (80,000 acres) located southeast of the village of Francisco Javier Mina, northwest of the village of Francisco I. Madero and east of the village of Ricardo Flores Magon. La Preciosa property covers Tertiary aged gold and silver bearing epithermal quartz veins, with barite and lesser quantities of base metals, primarily zinc and lead. There are three major vein and vein-breccia systems exposed on a series of hills and ridges, separated by flat floored valleys roughly 800 m wide. The main vein system consists of northward striking and westward dipping veins, plus east striking south dipping cross-cutting veins. The eastern vein-breccia system (Zona Oriente) strikes northwest. Two systems may intersect to the north beneath younger basalt. To the west of these is a third sub-parallel vein system, with north and northwest trending veins, dipping to the west. La Preciosa veins are composed of poly-phase veins of quartz, often banded, smoky, chalcedonic and amathystine, with a substantial amount of barite laths. Sulphide mineralization is scarce on surface and in the shallow underground workings. Drill core contains disseminated sphalerite, galena, pyrite and acanthite, plus iron and manganese oxides. Wall rocks adjacent to the veins are silicified, particularly between the prominent veins La Gloria and Abundancia. Kaolinite and hematite alteration is common, as well as more distal propylitic chlorite, epidote and pyrite. The oldest rocks, found only in deeper drill core, consist of Jurassic-Cretaceous graphitic schist, chlorite schist and layers of quartzite. Above the metamorphic units is a thick package of Cretaceous polymictic conglomerate, with lenses of arkosic sandstone. This sedimentary package is topped by Tertiary andesite tuff and andesite agglomerate of the regional Lower Volcanic Sequence. No rhyolites of the Upper Volcanic Sequence are found in the immediate study area, but can be seen on cliffs further to the west. The conglomerates and andesitic rocks are the main host rocks for the veins, but mineralization also extends into the metamorphic rocks. There are a few dioritic dykes in deeper core, but intrusive rocks are generally rare. The youngest unit comes from several Quaternary volcanic vents which erupted basalt flows, filling the lower valleys. Multiple veins in the main structural zone of La Preciosa ridge have been traced on surface for over 5 kilometres and drilling has revealed that the veins continue to the north beneath the basaltic cover. The veins are also interpreted to extend further south of known exposures. Individual veins have been traced for up to 1.6 km. Of the entire structural zone, the Abundancia and La Gloria veins, plus more recently the Martha vein, have been explored in the greatest detail. The Abundancia and La Gloria veins coalesce at depth, the merged vein is known as the Abundancia vein. There are 2.5 km of underground drifts, following the Abundancia and La Gloria veins, as well as a small portion of the Transversal vein. The original workings are over 100 years old, however, about 60% of the drifts were enlarged and resampled 26 years ago by Luismin. There is a winze that leads down to workings 50 metres below the main 2065 level in Abundancia vein. There are also several raises and small stopes which break through to surface on the Abundancia and La Gloria veins above the 2065 level. At the farthest south exposures, El Orito vein was drifted upon for several hundred metres over a century ago, but has had no modern exploration. Seven diamond drill holes, totaling 1,319 metres, were drilled by Luismin in a 1981-1982 program. The group of holes were mainly collared west of the Abundancia and La Gloria veins to test a 400 metre strike length of the veins roughly 50 to 75 metres below the 2065 level. The best intercept was from BP-1, which hit a true width of 13.6 metres at 232.0 g/t Ag and 0.10 g/t Au. Hole BP-7 was a longer hole which tested Abundancia and La Gloria veins and also intercepted the sub-parallel Luz Elena vein at greater depth. The 1981-1982 drill program was terminated due to falling metal prices at that time. Core from Luismin's program was split and the remaining half is intact and stored on site. A single 313 metre hole was drilled by Luismin in the eastern vein-breccia system in 1994. The hole intersected a series of variable silicified zones and veinlet stockwork anomalous in Ag, Au, Pb, Zn and Hg, but did not pass through the complete structure. In the 1980s, Luismin staff prepared several preliminary resource estimates, which were in-house and do not meet the current NI 43-101 reporting requirements for disclosure of Reserves and Resources. The studies showed a general "Resource" in all categories of approximately 320,000 tonnes in the Abundancia and La Gloria veins grading 238 g/t Ag, 0.70 g/t Au and 0.17 % Pb. The "Proven and Probable Reserves" stood at 30,000 tonnes grading 319 g/t Ag, 1.0 g/t Au, with 0.55 % Pb and Zn combined. These estimates do not follow the requirements for reserves and resources outlined in NI 43-101 as they were estimated prior to the enactment of NI 43-101, however, they have been obtained from sources believed reliable. The resource estimates are considered to be historic, are relevant, but have been replaced by recent estimates utilizing much more drilling data and using current CIM terminology. In June of 2004, Orko commenced a geological mapping and sampling program on La Preciosa. This was followed by a 40 line-km geophysical survey of Induced Polarization in the northern part of the property in January 2005, performed by SJ Geophysics under Orko's guidance. Orko commenced diamond drilling in March 2005 by Major Drilling International on La Preciosa Ridge, targeting Abundancia and La Gloria, but also extending to Luz Elena vein. The first 24 drill holes were completed by late October 2005 totaling 10,259 metres of diamond drill core. Favourable results from drilling and interpretation of distinct mineral-shoots within the Abundancia and La Gloria veins gave reason for Orko to make a first resource estimate for the property. Using a cut-off grade of 150 g/t silver-equivalent, Inferred Resource Estimate I totaled 2.72 million tonnes grading 227.2 g/t Ag and 0.462 g/t Au for a silver-equivalent grade of 255.0 g/t. Resource Estimate I was released on 19 January 2006 (Gunning and Whiting, 2006). Drilling continued and Inferred Resource Estimate II was released on 7 September 2006. This estimate was up to hole BP06-38 for a total of 16,334 metres in La Preciosa Ridge area, including Abundancia, La Gloria and Abundancia Zona Sur veins. Using a cut-off grade of 100 g/t silver-equivalent, Inferred Resource Estimate II totalled 4.05 million tonnes grading 207.4 g/t Ag and 0.384 g/t Au for a silver-equivalent grade of 230.4 g/t. Alternatively, at a 150 g/t cut-off, Inferred Resource Estimate II totalled 3.42 million tonnes grading 235.0 g/t Ag and 0.435 g/t Au for a silver-equivalent grade of 261.1 g/t. Drilling continued and Inferred Resource Estimate III was released on 13 March 2007. Inferred Resource Estimate III -- At 100 g/t Ag-Eq cut-off the estimate is 5.72 million tonnes grading 192.9 g/t Ag and 0.345 g/t Au, for a silver-equivalent of 213.6 g/t. At 150 g/t Ag-Eq cut-off the estimate is 4.39 million tonnes grading 229.9 g/t Ag and 0.396 g/t Au, for a silver-equivalent of 253.7 g/t. Drilling continued and Inferred Resource Estimate IV was released on 1 October 2007. Inferred Resource Estimate IV -- At 100 g/t Ag-Eq cut-off the estimate is 10.36 million tonnes grading 199.7 g/t Ag and 0.328 g/t Au, for a silver-equivalent of 219.4 g/t. At 150 g/t Ag-Eq cut-off the estimate is 6.88 million tonnes grading 256.6 g/t Ag and 0.387 g/t Au, for a silver-equivalent of 279.8 g/t. Drilling continued and Inferred Resource Estimate V was released on 31 March 2008. Inferred Resource Estimate V -- At 100 g/t Ag-Eq cut-off the estimate is 15.35 million tonnes grading 190.0 g/t Ag and 0.321 g/t Au, for a silver-equivalent of 209.2 g/t. At 150 g/t Ag-Eq cut-off the estimate is 6.88 million tonnes grading 256.6 g/t Ag and 0.387 g/t Au, for a silver-equivalent of 279.8 g/t. The Company's Resource Estimate VI was released Feb 18, 2009 is based the results all the holes drilled to date including the 2008 drilling of an additional 205 holes (79,021m) that was completed after the date of the last resource estimate. The La Preciosa deposit now comprises 47% Indicated Resources and 53% Inferred Resources. Current Indicated Resources are 10.64 million tonnes grading 0.27 g/t Au and 185 g/t Ag for a Silver-Equivalent grade of 201 g/t. at a cut off grade of 100 g/t. The contained metal equals 63.2 million ounces of Silver and 94,000 ounces of Gold for a Silver Equivalent of 68.9 Million Ounces. Current Inferred Resources are 12.0 million tonnes grading 0.25 g/t Au and 185 g/t Ag for a Silver-Equivalent grade of 200 g/t. at a cut off grade of 100 g/t. The contained metal equals 71.8 million ounces of Silver and 97,000 ounces of Gold for a Silver Equivalent of 77.6 Million Ounces.* In total, eight veins were modeled for the new estimate including the Martha Vein, which dominates the resource. In the process of modeling, lithological units were differentiated which helped in establishing the orientation and continuity of the individual veins. Using geological data along with the metal grades, it was possible to establish continuity of mineralized zones of stockwork, breccia, veins, and veinlets. The high-grade veins within these zones were segregated and modeled. All zones and veins were modeled into a three dimensional solid. Once defined, statistics of each domain and each vein were evaluated separately, and capping was carried-out individually for each vein and domain. The sample data was then composited to three-metre intervals. Grade continuity was evaluated separately for each vein and domain. Inverse distance squared estimation was used. A cut-off grade of 100 g/t was selected by MDA. Classification into Indicated and Inferred was dependent upon the vein continuity, geological continuity and proximity to the closest drill hole, as well as the number of samples and the number of drill holes used in the individual blocks. All reported resources lie within the modeled veins. The QA/QC work demonstrates reliability of the analytical data and the auditing of the database has shown it is accurate. * The six resource estimates are all undiluted using a 60:1 gold to silver ratio with no metallurgical extractive factors applied. Average drill hole spacing is approximately 100 metres for all the holes drilled from 2005-2008. For the 1981-82 program, analytical testing was performed in the Luismin Labs in Durango, Mexico. All 2005-2008 analytical testing has been done by SGS or Inspectorate laboratories, North American based labs both containing ISO certification. The Martha vein, first identified in hole BP06-77, represents the most significant new target. It is relatively flat lying, dipping an average of 20 degrees to the west. It has a known lateral extent of over four kilometres and varies in widths between 200m to 1.7 kilometres. The Martha vein varies in thickness from one meter to sixty meters and averages about 15. Within that are one or more veins or vein breccias which contain the resource grade material and which average about five meters. Orko has conducted geological mapping, geophysical testing and has systematically drilled a portion of the known strike length of epithermal silver-gold veins on the property. Two of the veins, La Gloria and Abundancia, were drill tested each along 1.2 km strike length to establish veins on "La Preciosa" which have been traced for five kilometres north-south, as well as multiple east-west veins. Some of the veins include Abundancia, La Gloria, Luz Elena, Carmen, Esperancita, Transversal, Incognita, Nueva, Sur, Ramal Sur, El Orito, Nancy, etc. The Martha Vein has been the focus of drill testing since its discovery in 2007. On April 14th, 2009 Pan American Silver Corp. and Orko Silver announced that they have agreed to form a joint venture to develop the La Preciosa project. Pan American will contribute its demonstrated mine development expertise, as well as 100% of the funds necessary to develop and construct an operating mine, in consideration for a 55% interest in the joint venture. Orko Silver retains a 45% interest fully carried to production. Since assuming operatorship of the project in April, Pan American has drilled 91 holes, including 23 holes on exploration targets for a total of 27,097m. Delineation drilling is in the Central Area of the La Preciosa Resource and consists of 66 holes (21,734m). Exploration drilling around the periphery of the Resource includes 15 holes (5,363m) from the South Area on the Martha Vein. The results of the exploration drilling to date from Baritina and El Vaquero, which are targets outside of the Martha vein resource, have been inconclusive. Further drilling has been done in both areas; results of which are pending. In most cases, Pan American drilled their holes at 50 m hole spacing between the 100 m hole spacing Orko utilized. The drilling to date program has been successful in confirming the results from the previous drilling completed by Orko from 2005-2008. This data has formed the basis of a geostatistical study, toward ultimate resource definition diamond drilling is underway. Pan American has completed a first phase detailed metallurgical program, which included: work index tests, abrasion tests, mineralogical studies, gravity tests, floatation tests and cyanide leach tests. The program was a follow-up to the preliminary testing conducted in 2008 by Orko (Orko's news release April 17, 2008). Additional flotation studies are still underway. Simple cyanide leaching yielded average silver recoveries of 91%, although the use of selective oxidants could further enhance these results. In addition, Pan American has been successful in reducing cyanide consumption to 1.6 kg/t, which is materially lower than the results from the metallurgical work previously completed by Orko. Lastly, the current test work has shown that with the use of oxidants, the leach cycle times can be reduced to 48 hours with minimal impact on ultimate silver recovery. In 2010, Pan American plans a continued aggressive exploration program. Work will include approximately 51,000m of diamond drilling, with the majority of the drilling slated for further resource definition; 100km of magnetometer surveys; more detailed metallurgical testing; additional engineering studies and a preliminary economic assessment. Drill testing of two additional exploration targets and the completion of a preliminary environmental impact study (EIS) are also integral parts of this year's planned program. In addition to continuing delineation and exploration drilling, as well as commencing additional metallurgical testing, the project is being actively advanced on a number of other critical path items. Hydrogeological services have been contracted to begin determining appropriate water sources and Pan American has been in active dialogue with the local communities and land owners in the project's immediate vicinity who would be affected by La Preciosa's development. Integral to the planned exploration and perhaps the most important investigation ongoing by Pan American will be determining the optimal mining method should all the results of the accelerated work program remain positive. Currently, Pan American is investigating the possibilities of mining the deposit by underground methods or by a large open pit or possibly a combination of the two methods. Pan American will need the results from the 2010 work program to determine the best approach to mining at La Preciosa. Pan American has budgeted $10 million for the planned 2010 exploration and development and is working towards completing a full feasibility study towards the end of the year; more than a year ahead of the timing contemplated in the April 2009 joint venture agreement. |
||||||
|
|||||||