Your browser does not support script


Projects
Projects Overview La Preciosa QA/QC Procedures   Summary | Drill Results | Maps and Sections | Photo Gallery | 43-101 Technical Reports Mineral Resources

Photo Gallery
Previous. All pages. Next. 1. 2. Page 3. 4. 5. 6in  columns
--
::
--
Drilling
107 KB, approx. 21 seconds at 56.6Kbps
--
::
--
Drawing The Wireline Core Barel Out
152 KB, approx. 29 seconds at 56.6Kbps
--
::
--
Drawing The Drill Rods
82 KB, approx. 16 seconds at 56.6Kbps
--
::
--
Drill Rig
188 KB, approx. 36 seconds at 56.6Kbps
--
::
--
Scenic
131 KB, approx. 25 seconds at 56.6Kbps
--
::
--
Sky
169 KB, approx. 32 seconds at 56.6Kbps
--
::
--
Drill Rig
188 KB, approx. 36 seconds at 56.6Kbps
--
::
--
La Preciosa
442 KB, approx. 1 minute, 23 seconds at 56.6Kbps
--
::
--
Snake Shedding Skin
1065 KB, approx. 3 minutes, 19 seconds at 56.6Kbps
--
::
--
La Preciosa East Ridge
1232 KB, approx. 3 minutes, 50 seconds at 56.6Kbps
--
::
--
Ridge Scenic
1480 KB, approx. 4 minutes, 36 seconds at 56.6Kbps
--
::
--
Ore Stockpile Patio
910 KB, approx. 2 minutes, 50 seconds at 56.6Kbps
Previous. All pages. Next. 1. 2. Page 3. 4. 5. 6in  columns
 
Home    Corporate    Projects    Investors    News    QwikReport    Contact
Copyright © 2006 Orko Silver Corporation All Rights Reserved.
Adnet Communications Inc.